Easy Erection Structural Steel Erection/assembly/installation/erector For Warehouse

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Shandong
Validity to: Long-term effective
Last update: 2017-12-21 23:39
Browse the number: 462
inquiry
Company Profile
 
 
Product details


Key advantage:

 

1)Top client: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil etc.

2)90% exported to 40 countries like Germany, America, Slovakia,Saudi Arabia, South Africa, Oman etc.Total weight 400,000tons.

3)Certificate:

ISO9000, ISO14000, ISO18000 by BV France        

EN-1090 CE certificate

American CWI

European TWI

European IWE

 

1.Established as a reputed business, we specialise in the design, fabrication and erection of all types of structural steelwork incorporating both new build and refurbishment.

Our experienced, professional staff ensure economical cost-effective projects working closely with main contractors and consultants. Thus satisfying all of the clients’ specific requirements, often within limited time constraints.

Whilst established in the design and fabrication of traditional portal frames, beams and columns, we have also built a portfolio of unique and challenging projects.  

 

2.At the forefront of our specialist steelwok industry

A reputed business formed, we are now the third largest steelwork contractor in the Northern China, operating anywhere in the country supplying steelwork, steel building, metal decking, cladding and glulam timber structures for buildings as diverse as portal frame buildings, to schools, hospitals, stadia and infra-structure buildings.

 

3.Our workshop building:

Color As customer’s requirement

Standard DIN GB ISO ANSI

Grade Q235(S235JR,A36),Q345(S355JR,Gr50)

Span life Usually 25-100 years,according to the buliding usage

Surface Treatment First Shot blasting 2.5a,then painting or Hot dipped galvanized

Low Cost Prefabricated Steel Structure Buildings are use for workshop,plant,warehouse,storage,apartment,hangar,residential house ,horse stable,bridge,agriculture building,commercial building etc.

 

4.The painting of fabrications is vitally important. It is applied at the end of the production line, the steel never leaving the temperature controlled environment. Complete with heating and extractor fans serviced by 5 & 10 tonne cranes.

 

5.Project case1:

Corrugated steel sheet warehouse

Main steel frame:

Wind-resistant column:Q345,Welded H beam

Bracing:

Roof system and Wall system:

0.5mm thickness,corrugated steel sheet

Window and Door:

Windows: Plastic Steel Window/Aluminum-alloy Window

Door: Sliding Door/Rolling Door

 

6.Project case2:

Warehouse (14000M2)---- Republic of Uzbekistan

Workshop (12000M2)----Canada

Warehouse(3600M2)---Romonia

Vegetable Market(2500M2)---- Mauritius

Pig shed(3500M2)---USA

Chicken shed(2800M2)— Austrilia

Aircraft Hangar(1300M2)------Austrilia

Warehouse(900M2)---- Mongolia

Prefabricated house(70M2)----800 sets---Angola

Container house(20’)-----60 sets— South Africa

 

7. We have been involved in“structural steel installation”supply for many years. 

It has different names like below:

steel structure assembly

steel erection

steel erector

structural steel erection

we have very good reputation in this field all over the world. 


Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]